Ground movement assessment.

Ground movement impact assessment for developments interfacing with existing buildings. For engineers, architects, surveyors, developers, and planning consultants.

Excavation and building construction, in the same analysis.

The first assessment tool that captures both basement excavation and proposed building loading, so both short and long term conditions are captured.

Different construction stages in a single assessment

Quantify ground movement from both the basement excavation and the building loading in one analysis.

Existing building

Key walls/facades of each neighbouring building identified and assessed using the well-established Burland damage classification scale.

Project-specific assessment

Locate the site and sketch the proposed scheme footprint. Nearby buildings are automatically recognised, enabling rapid assessments with minimal user input.

Shareable PDF

Export a brief summary to discuss with the client and the design team.

Three steps.

Locate

Find the site.

Define

Sketch the basement and the building. Choose key input parameters. Surrounding buildings are identified automatically.

Assess

Get the impact envelope and wall/facade specific damage category seconds.

For preliminary screening and feasibility. Not a replacement for detailed FE analysis or specialist assessments later in the project.

Try it on your next scheme.

Free beta version.