Preliminary ground movement assessment.

Indicative third-party impact for excavation and construction projects, at concept stage. For structural engineers, architects, developers, and planning consultants.

Excavation and construction, in the same analysis.

The first preliminary assessment tool that captures both basement excavation and the new building above ground — so the impact you see reflects the actual scheme.

Unified scheme impact

Quantify ground movement from both the basement and the new building in one analysis. Most screening tools only do half.

Per-facade damage screening

Every adjacent wall receives an indicative damage category, from negligible to severe.

On the real site

Locate the site, draw the scheme, pull the surrounding buildings from the map. Sensible inputs, no manual digitising.

Shareable PDF

Export an indicative assessment to discuss with the client and the design team.

Three steps.

Locate

Find the site. Pull the surrounding buildings from the map.

Define

Sketch the basement and the building. Choose a few inputs.

Assess

Get the impact envelope and per-facade damage in seconds.

For preliminary screening and feasibility. Not a replacement for detailed FE analysis or specialist assessments later in the project.

Pricing.

Freemium
£0

Free, always.

Get started

Try it on your next scheme.

One month free.